Service Works
|
Repair, Rewind and Refurbishment (Factory) |
|
Year |
Customer |
Scope |
Destination |
|
2001 |
Kerr McGee |
HV Motor. Build new rotor core. Rebuild and Test |
UK Offshore |
|
2002 |
North British Distillery |
HV Motor. Replace bearings and coupling. Test |
UK |
|
2002 |
BP Exploration |
Replace stator pack, refurbish and test one 20 970 kW, 4 pole, 13 800 V generator |
Colombia |
|
2003 |
Oil Company |
GE Motor. Stator rewind, rebuild and test |
Middle East |
|
2003 |
Powergen |
HV Motor. Rotor rewind and repair stator. Works test |
UK |
|
Site Operations |
|
Year |
Customer |
Scope |
Destination |
|
2000 |
Howden Power |
Install and commission one 6 500 kW, 10 000 V, 6 pole, Synchronous Softstart System for Sinter Fan drive |
China |
|
2002 |
BP Exploration |
Install and commission of two 20 970kW, 4 pole, 13 800 V generators. Recommission AVR |
Colombia |
|
2002 |
Rolls-Royce Power Engineering |
Commissioning of three 20 380 kW, 11 000 V, 4pole generators and AVR's |
Pakistan |
|
2002 |
Alstom Power |
Install and commission one 8 380 kW, 4 pole, 6 300 V generator and AVR |
Turkey |
|
2003 |
Thermodyn |
Commission one 37 410 kW, 4 pole, 13 800 V, control scheme and AVR |
USA |
|
Site Operations (Projects) |
|
Year |
Customer |
Scope |
Destination |
|
2000 |
NEC |
New core and windings Site Installation Replace AVR and commission 10 000 kW Diesel Generator |
Sudan |
|
2001 |
Enron |
Site modifications, testing and commissioning 22 000 kW Generator |
USA |
|
2001 |
BP |
Install 5 000 kW 20 pole compressor drive motor. Site testing |
UK |
|
2002/3 |
Ministry of Defence |
Install and commission 4 500 kW Frequency Changer Set complete with switchgear cabling and controls |
Gibraltar |
|
2003 |
MEW |
Supply and replace end bells Brush F5 generator. Site installation, testing and commissioning |
Bahrain |
Back to Trade References
|
|
|